We invent, develop and build technologies for the energy industry

Click here to edit subtitle

Tools for substantial cost reduction in P&A

The MicroTubeRemover Wellbore Intervention Tool
Remove the need for a rig, by removing the need to pull production tubing.

Sequence:
00:14 Tool locates collar, and then engages its anchors (to hold tool stationary while doing next operations).
00:42 Sensor/milling module rotates to locate micro tubes and upper side of cable protector.
00:55 Milling tool penetrates tubing above clamp, mills down until contact with this and then rotates while cutting micro tubes.
01:15 Tool has released both anchors and moves up to cable clamp above where tubes were cut.
01:19 Tool locates collar, and again engages its anchors.
01:35 Sensor/milling module rotates to locate micro tubes and upper side of cable protector.
01:42 The mill penetrates the tubing (but do not extend far enough to damage/cut micro tubes), and cuts away a window in the production/injection tubing.
02:05 The gripper is extended from the tool, rotated followed by grabbing and pulling in the micro tubes.
02:14 The mill is again extended, to a depth sufficient to cut micro tubes. Tubes are cut.
02:24 The anchors has been released and the tool is pulled out of the wellbore, with the micro tubes held in place against the tool by the gripper.

To allow leaving production/injection in a wellbore permanently for well abandonment, any micro tubes (control lines, sensor cables, chemical injection lines, etc.) outside the tubing must be removed to properly place a barrier material as for example cement in the production annulus. The patent pending wireline (alternatively e-coil tubing) tool being developed will remove the micro tubes and bring them to surface so that such a barrier placement can be done.


- And yes, we can also just cut the micro tubes at various locations, thereby breaking the leak path. Just in case you do not need to retrieve the lines to surface.


This animation illustrates how the tool we are developing will locate production/injection tubing collars, then locate micro tubes externally of the tubing, followed by cutting the lines above a cable protector, whereafter the lines are grabbed, cut and retrieved from outside the tubing.